2022
Satori Reports 8.74 g/t Gold over 2.0 Metres from Fall Drilling Campaign
Toronto, Ontario – November 28, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce the latest drill results from the fall exploration drilling program at the 100%-owned Tartan Lake deposit near Flin Flon, Manitoba. This program focused on near surface extensions of the Main Zone and South Zone mineralization.
Satori Announces Completion of Fall Drilling at Tartan Lake Gold Mine Project
Toronto, Ontario – November 7, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) announces the completion of its 2022 fall drilling campaign where three holes were drilled, one at Main Zone and two holes at South Zone. Drilling at each zone was intended to follow up from the 2021 results, and to increase the geological confidence of the current mineral resource.
Satori Commences Fall Drilling Campaign at Past Producing Tartan Lake Gold Mine, Flin Flon, Manitoba
Toronto, Ontario – September 22, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce the commencement of its fall drilling campaign at the Tartan Lake Project, Flin Flon, Manitoba.
Satori Reports 29.06 g/t Gold over 5.85 Metres in Latest South Zone Drill Holes
Toronto, Ontario – August 11, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce the latest drill results from the spring exploration drilling at the 100%-owned Tartan Lake deposit near Flin Flon, Manitoba. Satori’s winter drill program focused on shallow holes targeting extensions of the South Zone mineralization down plunge to the west and initial drilling of the McFadden target, a broad area of intense quartz carbonate veining located approximately 1,600 metres south of the South Zone.
Satori Awaits Assays from 2022 Phase I Drilling Completed at Tartan Lake Gold Mine Project
Toronto, Ontario – May 25, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce the completion of its 2022 Phase I drill program at Tartan Lake. A total of 10 holes (2,900 metres) was completed. Seven holes targeted the McFadden showing, an area of intense quartz-carbonate-tourmaline veining hosted in intensely sheared and deformed volcanics, approximately 1.5 kilometres south of the Main Zone.
Satori Moves Drill Locations and Engages Investor Relations
Toronto, Ontario – April 20, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce that drilling at the South Zone has now commenced at the Tartan Lake Gold Mine Project, after having completed diamond drilling at a remote/satellite target area (McFadden) located 1 kilometre south-east of the known Main Zone/South Zone deposit.
Satori Commences Drilling and Preliminary Work for an IP Survey
Toronto, Ontario – March 25, 2022 – Satori Resources Inc. (TSXV: BUD) (“Satori” or the “Company”) is pleased to announce that a drilling campaign and preliminary work to complete an IP survey are underway at the Tartan Lake project, Flin Flon, Manitoba.
Satori Plans for Step Out Drilling Targeting Recent Interval of 47.56 g/t Gold over 5.8 Metres
Toronto, Ontario — February 7, 2022 – Satori Resources Inc. (TSXV: BUD) (“Satori” or the “Company”) is pleased to announce that it has received its Exploration Permit for the 100% owned Tartan Lake Project, Flin Flon, Manitoba, which is valid for a three-year period and allows for 155,000 meters of drilling.